Office Design & Fit-out Hong Kong

Hong Kong office fit-out design, engineering construction and FF&E integration

Based on the company's business, personnel structure and brand needs, we provide space planning, design concepts, detailed construction drawings, material selection, mechanical and electrical design, fire-services submission coordination and on-site construction. Designers, project managers and construction teams jointly participate in the design development, making the final implementation more realistic.

Office interior before and after fit-out comparison
INNOFLEX rapid office · space full projectProject context map
Three types of enterprise office delivery models

Based on your company's area, business pace, building restrictions and delivery window, configure a combined plan of design and construction, material supply, local construction in Hong Kong and acceptance handover.

SKU 01
Quick Start quick activation package

Suitable for growing companies to quickly open new offices, emphasizing space planning, modular furniture, standard materials and short-term on-site construction.

  • Modular spacing and high-frequency use area optimization
  • Basic strong and weak current and lighting wiring
  • BMO construction reporting and rapid completion confirmation
Configure quick enablement scope
SKU 02
Corporate Corporate Case Fit-out

Suitable for financial institutions, professional services, technology companies and corporate headquarters, providing brand front rooms, conference systems, office areas, furniture FF&E and electromechanical deepening solutions.

  • Exclusive branded front lobby and high-acoustic isolation conference room
  • Licensed AP/RSE Full BD Minor Works with WR1 Approval
  • Intelligent access control, AV video system and MEP mechanical and electrical modification
Configure the entire enterprise case scope
SKU 03
Partial / Night partial and night transformation

It is suitable for office relocation, expansion, brand upgrade or partial renovation in business. Zoning or phased construction plans can be developed according to operational arrangements.

  • Night/weekend off-peak construction scheduling
  • Dustproof, noiseproof, isolation and protective measures
  • Mechanical and electrical capacity expansion and partial wall furniture update
Configure phased transformation scope
Enterprise-Level Closing Price and Range Quotation (BoQ) Matrix

After the scope is frozen, a closed-price contract is implemented; office design, construction, electromechanical, furniture, soft furnishings, materials, and approval submissions are displayed in full detail by project category to reduce subsequent extra items.

Range quote inclusions
  • Spatial planning and engineering deepening:Plans, effects, construction drawings, material lists and budget preparation
  • Hardware removal and wall partitioning:Light steel keel gypsum boards, glass partitions, woodwork and finishing projects
  • Ceiling and ground engineering:Moisture-proof and anti-static carpet, elegant sound-absorbing mineral wool board/shaped ceiling
  • MEP Mechanical, Electrical and Fire Protection:Independent air outlet adjustment, sprinkler head shifting, fire alarm docking
  • Strong and weak current and network:Cat6 network cabling, weak current cabinet wiring, special sockets
  • Materials furniture and soft furnishings:Plates, hardware, stone, lamps, office furniture, brand furnishings
  • Compliance filing and insurance:Third party liability insurance, employees compensation insurance, WR1 completion certificate and management office information
Hong Kong compliance and approval protection

We coordinate the interface between professionals, contractors and management offices according to project needs to reduce the risks of shutdown, re-delivery and acceptance.

BD Minor Projects

Buildings Department Class II/III minor works filing and compliance issuance.

Power WR1 Proof

The Electrical and Mechanical Services Department (EMSD) accredits electricians to sign electrical safety certificates.

Fire FS Certificate

The Fire Services Department (FSD) approves the fire protection contractor's plan and acceptance declaration.

Building BMO Permit

It complies with the construction and deposit requirements of top management offices such as Swire, Land, and Sun Hung Kai.

Inverted schedule and visualized project weekly reports and key daily reports

Work backwards from the determined opening date to all nodes, and synchronize the progress matrix with weekly reports, key daily reports and on-site photos.

1
Site Survey and Freeze Plane
On-site review of dimensions, determination of mechanical and electrical points and requirements
2
BoQ confirmation and BMO approval
Submit to the management office for review and apply for a construction permit
3
Concealed Engineering and MEP Construction
Daily push of pictures and texts, key nodes for acceptance
4
Hard decoration and FF&E come into play
Lighting and furniture installation, ambient air testing
5
Acceptance and handover document package
Delivery of As-built drawings, WR1 and warranty
Get a scope quote and PMO schedule for your office

Applicable to corporate offices above 500 square feet; once the information is complete, we can first form a preliminary scope, key risks and PMO construction schedule framework.

Enterprise delivery standard
Turn Hong Kong office fit-out into a quotation of the same caliber first

Public market data shows that the cost per square foot of office fit-out in Hong Kong varies greatly. We first list the fire protection, air conditioning, furniture, IT/AV, management office designated projects, night construction and professional expenses, and then discuss whether the budget is controllable.

01 / Cost Boundary
cost frontier

Use the BOQ to indicate inclusions, exclusions, tentative amounts, lock-in periods, and change approvals to avoid comparing solely on price per square foot.

02 / Compliance pre-requisite
Compliance pre-requisite

Check BMO Renovation Manual, Minor Works, WR1, Electrical, Fire and Insurance Liabilities before floor freeze.

03/Evidence of construction period
Construction period evidence

Split approval, procurement, prefabrication, arrival at the port, on-site construction, testing and debugging, and defect rectification into traceable nodes.

Office decoration
The six-piece project package we have prepared for your company
documentfor confirmation
Compliance Responsibility MatrixManagement Office, BD/FSD, WR1, Designated Contractor and Acceptance Responsibilities
Same caliber BOQInclusion/exclusion, tentative amount, change unit price, tax and price lock period
Construction period basis tableApproval, procurement, prefabrication, arrival at port, construction, testing and defect rectification
Personnel and InsuranceLegal Construction Arrangements, Employees' Compensation, Third Party Liability and Site Responsible Persons
material evidenceBrand models, samples, low VOC/formaldehyde testing data and substitution rules
Corporate project weekly report samplePlan/actual, on-site photos, risk closed loop, your company’s decision-making matters and next week’s milestones
48-hour review
Start enterprise-level project pre-review for your company

Your company provides the lease/restoration terms, management office fit-out manual, floor plan and target move-in date. After we compile the risk list, overall schedule and budget gap table.

Hong Kong Tel
+852 5225 7861

Email
[email protected]

Book a project review

Service hours:
9:00-18:00 (Mon-Fri)

WhatsApp

WhatsApp QR code

Scan to chat on WhatsApp