What is an office restoration project?

  • Original condition/handover standard
  • Differences from decoration and demolition
  • Typical work items
What is the office restoration project · Space and delivery vision (project context picture)
What is office restoration project · Space and delivery visionProject context map
01 / Fit
Which type of project is suitable for your company?

We first complete the pre-review based on your company's area, current situation, target date and building constraints, and then decide whether to proceed with on-site inspection or document review.

02 / Scope
How do we lock down the scope

We write the inclusions, exclusions, tentative amounts, your firm’s input and professional liability into the same itemized scope sheet.

03 / Delivery
How can your company master delivery?

We use the overall schedule, confirmation nodes, weekly reports, change records and handover catalogs to allow your company to continuously understand the status of the project.

From pre-review to project approval

We first complete the pre-review of conditions, and then complete the final project confirmation with on-site and documents.

01
Submit information

Area, current status, target date and building.

02
Enterprise pre-qualification

Identify management office responsibilities, approval nodes, long-delivery projects and management decision-making points.

03
Site survey

Check dimensions, mechanical and electrical, fire protection and construction conditions.

04
Freeze project scope

Develop itemized scope quotation, overall PMO schedule and decision list.

Start a project

After your company provides floor plans, lease requirements or restoration letters, we first complete the scope, responsibility and time boundary confirmation.

Enterprise delivery standard
Review documents for restoration project first, then discuss demolition

The core of the lease return and restoration is not to demolish it quickly, but to hand over the building according to the lease, restoration letter and management office standards. We start by writing the definition of the original condition, appointing the contractor, night work, waste disposal and joint acceptance into the list.

01 / Lease Responsibilities
Lease Responsibilities

Circle the restoration obligations of partitions, ceilings, floors, mechanical and electrical, fire protection, access control and furniture, and distinguish the responsibilities of tenants, owners and management offices.

02 / Deposit risk
Deposit risk

Make an early warning list of items that may affect the deposit, and confirm whether you need to appoint a contractor before quoting.

03 / Handover documents
Handover documents

Keep construction records, cleaning records, acceptance photos and management office confirmations to reduce disputes over building handover.

What is a restoration project?
The six-piece project package we have prepared for your company
documentfor confirmation
Compliance Responsibility MatrixManagement Office, BD/FSD, WR1, Designated Contractor and Acceptance Responsibilities
Same caliber BOQInclusion/exclusion, tentative amount, change unit price, tax and price lock period
Construction period basis tableApproval, procurement, prefabrication, arrival at port, construction, testing and defect rectification
Personnel and InsuranceLegal Construction Arrangements, Employees' Compensation, Third Party Liability and Site Responsible Persons
material evidenceBrand models, samples, low VOC/formaldehyde testing data and substitution rules
Corporate project weekly report samplePlan/actual, on-site photos, risk closed loop, your company’s decision-making matters and next week’s milestones