Cat A / Cat B Comparison Guide

  • Define difference table
  • Responsibility
  • Impact on budget and construction schedule
Cat A / Cat B Comparison Guide · Space and Delivery Vision (Project Contextual Illustration)
Cat A / Cat B Comparison Guide · Space and Delivery VisionProject context map
01 / Fit
Which type of project is suitable for your company?

We first complete the pre-review based on your company's area, current situation, target date and building constraints, and then decide whether to proceed with on-site inspection or document review.

02 / Scope
How do we lock down the scope

We write the inclusions, exclusions, tentative amounts, your firm’s input and professional liability into the same itemized scope sheet.

03 / Delivery
How can your company master delivery?

We use the overall schedule, confirmation nodes, weekly reports, change records and handover catalogs to allow your company to continuously understand the status of the project.

DimensionsCat ACat B
status quoCompleted to owner's standardsTenant’s secondary decoration
BudgetUsually includedTenant responsible entity
submitDepends on buildingOften involving multiple majors
From pre-review to project approval

We first complete the pre-review of conditions, and then complete the final project confirmation with on-site and documents.

01
Submit information

Area, current status, target date and building.

02
Enterprise pre-qualification

Identify management office responsibilities, approval nodes, long-delivery projects and management decision-making points.

03
Site survey

Check dimensions, mechanical and electrical, fire protection and construction conditions.

04
Freeze project scope

Develop itemized scope quotation, overall PMO schedule and decision list.

Start a project

After your company provides floor plans, lease requirements or restoration letters, we first complete the scope, responsibility and time boundary confirmation.

Enterprise delivery standard
Turn Hong Kong office fit-out into a quotation of the same caliber first

Public market data shows that the cost per square foot of office fit-out in Hong Kong varies greatly. We first list the fire protection, air conditioning, furniture, IT/AV, management office designated projects, night construction and professional expenses, and then discuss whether the budget is controllable.

01 / Cost Boundary
cost frontier

Use the BOQ to indicate inclusions, exclusions, tentative amounts, lock-in periods, and change approvals to avoid comparing solely on price per square foot.

02 / Compliance pre-requisite
Compliance pre-requisite

Check BMO Renovation Manual, Minor Works, WR1, Electrical, Fire and Insurance Liabilities before floor freeze.

03/Evidence of construction period
Construction period evidence

Split approval, procurement, prefabrication, arrival at the port, on-site construction, testing and debugging, and defect rectification into traceable nodes.

Cat A / Cat B comparison
The six-piece project package we have prepared for your company
documentfor confirmation
Compliance Responsibility MatrixManagement Office, BD/FSD, WR1, Designated Contractor and Acceptance Responsibilities
Same caliber BOQInclusion/exclusion, tentative amount, change unit price, tax and price lock period
Construction period basis tableApproval, procurement, prefabrication, arrival at port, construction, testing and defect rectification
Personnel and InsuranceLegal Construction Arrangements, Employees' Compensation, Third Party Liability and Site Responsible Persons
material evidenceBrand models, samples, low VOC/formaldehyde testing data and substitution rules
Corporate project weekly report samplePlan/actual, on-site photos, risk closed loop, your company’s decision-making matters and next week’s milestones
48-hour review
Start enterprise-level project pre-review for your company

Your company provides the lease/restoration terms, management office fit-out manual, floor plan and target move-in date. After we compile the risk list, overall schedule and budget gap table.